Description and objectives

 

The activity consists in the elaboration of the Feasibility Document of Design Alternatives (DOCFAP), aimed at defining the treatments to be carried out and the connections to be made to the existing works for the water supply of the Municipality of Campagnano di Roma. The objective is to guarantee a safe hydropotable source to the water network, through the treatment of local well waters for the removal of pollutants with values above the limits imposed by Legislative Decree no. 18 of 23 February 2023.

 

 

Project alternatives

    Alternative 1A:

     

    • Intervention: mixing the local water with a part taken from the Peschiera aqueduct, in sufficient quantity to reduce the fluoride content.

     

    • Flow rate: local waters from the La Mola wells (21.5 L/s) and Pozzo del Salvatore well (3.5 L/s) and a significant portion from the Peschiera aqueduct (30 L/s).

     

    • Purpose: to ensure drinkability by means of a higher portion of withdrawal from the Peschiera aqueduct.

    Alternative 1B:

     

    • Intervention: mixing of local waters with a part taken from the Peschiera aqueduct to ensure drinkability.

     

    • Flow rate: local waters from the La Mola wells (5 L/s) and from Pozzo del Salvatore well (2 L/s) with an increase in the flow rate from the Peschiera aqueduct (43 L/s).

     

    • Purpose: to ensure drinkability by means of a higher portion of withdrawal from the Peschiera aqueduct.

     

    Alternative 2:

     

    • Intervention: increase in local resources without withdrawals from the Peschiera aqueduct with local treatments to make the water drinkable.

     

    • Flow rate: water from La Mola wells (65 L/s) and Pozzo del Salvatore well (3.5 L/s).

     

    • Treatment: removal of arsenic, iron, manganese and fluorides through specific processes (filtration, oxidation and reverse osmosis).

     

    • Purpose: to treat the local waters entirely, in order to make them drinkable, without the need to withdraw from the Peschiera aqueduct.

     

    Alternative 3:

     

    • Intervention: increase in local collection without involving the Peschiera aqueduct with different connections and discharge methods.

     

    • Treatment: removal of arsenic, iron, manganese and fluorides through specific processes (filtration, oxidation and reverse osmosis).

     

    • Purpose: to ensure drinkability through complete treatment of local waters without withdrawals from the Peschiera aqueduct.

    Analysis and choice of the Solution:

     

    To determine the most advantageous solution, a multi-criteria analysis was carried out. The technical solution chosen represents the best compromise between sustainability, implementation times, impact on the territory and costs. The expected benefits include the definitive resolution of the problems related to the water supply for the Municipality of Campagnano di Roma.

    Project details

     

    Customer

    Acea Ato 2

    Site

    Municipality of Campagnano di Roma

    Timetable

    Start: January 2024
    End: March 2024

    Detail of the service

    • DOCFAP (Feasibility document for design alternatives)

    Key numbers

    Service execution quota

     

    100% Acea Infrastructure SpA

    Average cost of design alternatives

     

    18.325.650 €

    including security charges

    Discover all the projects

    a basin at the source of the North Rome treatment plant with an orange iron bridge and trees in the background

    Upgrading of biogas in biomethane at the Roma Nord Purification Plant

    read more
    Stack of worker helmets

    Safety inspections on grids and service maintenance framework agreements

    read more
    South Rome treatment plant infrastructure containing water

    New biofiltration section at the Roma Sud Purification Plant

    read more
    Laptop placed on an office desk. A smartphone and a cactus plant are also visible

    The Co.Si. platform in support of the verification of professional technical suitability

    read more
    treatment plant infrastructure with a water basin

    Adaptation of the La Chiusa purification plant

    read more
    Worker working on water infrastructure where a water basin is also visible

    Construction of the Belvedere water tank

    read more
    plastic containers

    Determination of microplastics in water for human consumption

    read more
    Two men and a woman in high-visibility clothing plan activities in a warehouse

    Safety coordination during the execution stage in 2023-2024

    read more
    worker performing tests on an electrical cabinet with a large blue pipe in the background

    Water supply of the Municipality of Campagnano di Roma

    read more
    water infrastructure with a basin full of water, iron structures and trees in the background

    Revamping Depuratore Santa Marinella Nord

    read more
    hands weighing a substance on a scale in a laboratory setting

    Enhancement of purification plant grids

    read more
    water collection basin in the Peschiera aqueduct infrastructure

    Coordination of safety during the design phase in the New Peschiera Aqueduct

    read more
    worker operating machinery with a large orange pipe behind him

    Doubling of the VIII siphon - Casa Valeria / exit Galleria Ripoli section

    read more
    scale model of an electrical system

    Adjustment of the Valleranello Primary Cabin

    read more
    young girl conducting analysis in a laboratory

    Micro-pollutants in the human body

    read more
    Aerial view of the Colle Sant'Angelo landscape, with trees and water reservoir

    Monte Castellone - Colle Sant'Angelo duct

    read more