Construction of the Belvedere water tank

Operaio che lavora su una infrastruttura idrica in cui si vede anche una vasca d'acqua

Description and objectives

 

The intervention focuses on the construction of a new water tank in reinforced concrete with a capacity of 2,000 m³, located in the Belvedere area, Municipality of Fiano Romano. The project also includes the related connection and discharge pipes.

 

Project specifications

Civil works

 

Tank

  • Construction of a reinforced concrete tank with all the necessary structures.

  • Installation of electromechanical, electrical and video surveillance systems.

     

External Arrangements

  • Construction of an access ramp, fences and green spaces around the tank.

 

Discharge siphon

  • Construction of a DN400 cast iron pipe for the outflow of water into the ditch and bank protection works.

Network-related works

 

Power supply pipes:

  • Construction of a DN400 cast iron supply pipe, including the line structures, from the manoeuvring chamber.

  • Construction of a DN300 cast iron supply pipe with the related line structures.

 

Supply pipelines:

  • Construction of a DN300 cast iron supply pipe, up to the joint outside the manoeuvring chamber.

  • Connection of the new pipelines to the existing network and testing of the networks.

The project solves several critical issues that emerged from the studies conducted by Acea Infrastructure, including the considerable variations in network altitude, a high degree of leakage and the insufficient compensation capacity of existing tanks.

 

The tank is supplied by the Capodimonte tank via a DN300 cast iron pipe (L= 2,157 m). The pipeline initially follows the provincial road 19/a – Via Civitellese for about 500 m, then continues for about 900 m along the West beltway "S.P. Tiberina – S.P. Civitellese".

 

The connection to the distribution network takes place through a DN400 cast iron pipe (L= 603 m). In addition, a new DN300 cast iron pipe (L= 1,133 m) was built to feed the areas to the northeast of the historic centre and around Via Tiberina.

 

A DN400 duct (L= 310 m) was made of spheroidal cast iron for the delivery of overflow and emptying water to the Fosso dei Ponticelli.

 

The tank consists of two rectangular basins with internal dimensions of 12.90 x 21.00 m each. The manoeuvring chamber has dimensions of 4.50 x 30.80 m.

Project details

Customer

Acea Ato 2

Site

Municipality of Fiano Romano

Timetable

Start: September 2024
End: October 2025

Detail of the service

  • Engineering services during the execution of works (Works Management).

     

  • Procurement of services and supplies, and the coordination of all the work necessary to provide the Customer with the finished work in a state-of-the-art manner.

Key numbers

Service execution quota

 

100% Acea Infrastructure SpA

 

 

Number of tanks

 

2

Amount of works

 

10.341.580 €

(of which €427,720 are for security costs)

 

 

Total capacity

 

2.000 m3

Residents in the district served by the project

 

7590 - with the expected demographic increase (time horizon 30-40 years), we will reach 15,280 inhabitants (project value).

Quotas

 

maximum water head 131.00 m above sea level and bottom at 127.00 m above sea level (maximum water head equal to 4 m)

 

 

Pipelines

 

approx. 3,9 Km

Discover all the projects

zoom su una mano che tiene in mano una provetta di laboratorio vicino a dei macchinari

PROMISCES Project

read more
Pila di caschi da operaio

Safety inspections on grids and service maintenance framework agreements

read more
porzione della struttura in ferro dell'infrastruttura

IV linea San Vittore

read more
Una uomo in un laboratorio riempie delle provette

Bioref-Full Project

read more
Laptop poggiato su una scrivania d'ufficio. Si vede anche uno smartphone e una pianta di cactus

The Co.Si. platform in support of the verification of professional technical suitability

read more
contenitori di plastica

Determination of microplastics in water for human consumption

read more
Due uomini e una donna in tenuta ad alta visibilità pianificano delle attività in un magazzino

Safety coordination during the execution stage in 2023-2024

read more
infrasturttura idrica con una vasca piena d'acqua, delle strutture in ferro e gli alberi sullo sfondo

Revamping Depuratore Santa Marinella Nord

read more
mani che pesano una sostanza su una bilancia in un contesto di laboratorio

Enhancement of purification plant grids

read more
vasca di raccolta dell'acqua nell'infrastruttura dell'acquedotto del peschiera

Coordination of safety during the design phase in the New Peschiera Aqueduct

read more
operaio al lavoro su un macchinario. ha alle spalle un grande tubo arancione

Doubling of the VIII siphon - Casa Valeria / exit Galleria Ripoli section

read more
giovane ragazza in fase di analisi in un laboratorio

Micro-pollutants in the human body

read more
Vista dall'alto del paesaggio di Colle Sant'Angelo, con alberi e bacino idrico

Monte Castellone - Colle Sant'Angelo duct

read more