Construction of the Belvedere water tank

Worker working on a water infrastructure where a water tank can also be seen Worker working on a water infrastructure where a water tank can also be seen

Description and objectives

 

The intervention focuses on the construction of a new water tank in reinforced concrete with a capacity of 2,000 m³, located in the Belvedere area, Municipality of Fiano Romano. The project also includes the related connection and discharge pipes.

 

Project specifications

Civil works

 

Tank

  • Construction of a reinforced concrete tank with all the necessary structures.

  • Installation of electromechanical, electrical and video surveillance systems.

     

External Arrangements

  • Construction of an access ramp, fences and green spaces around the tank.

 

Discharge siphon

  • Construction of a DN400 cast iron pipe for the outflow of water into the ditch and bank protection works.

Network-related works

 

Power supply pipes:

  • Construction of a DN400 cast iron supply pipe, including the line structures, from the manoeuvring chamber.

  • Construction of a DN300 cast iron supply pipe with the related line structures.

 

Supply pipelines:

  • Construction of a DN300 cast iron supply pipe, up to the joint outside the manoeuvring chamber.

  • Connection of the new pipelines to the existing network and testing of the networks.

The project solves several critical issues that emerged from the studies conducted by Acea Infrastructure, including the considerable variations in network altitude, a high degree of leakage and the insufficient compensation capacity of existing tanks.

 

The tank is supplied by the Capodimonte tank via a DN300 cast iron pipe (L= 2,157 m). The pipeline initially follows the provincial road 19/a – Via Civitellese for about 500 m, then continues for about 900 m along the West beltway "S.P. Tiberina – S.P. Civitellese".

 

The connection to the distribution network takes place through a DN400 cast iron pipe (L= 603 m). In addition, a new DN300 cast iron pipe (L= 1,133 m) was built to feed the areas to the northeast of the historic centre and around Via Tiberina.

 

A DN400 duct (L= 310 m) was made of spheroidal cast iron for the delivery of overflow and emptying water to the Fosso dei Ponticelli.

 

The tank consists of two rectangular basins with internal dimensions of 12.90 x 21.00 m each. The manoeuvring chamber has dimensions of 4.50 x 30.80 m.

Project details

Customer

Acea Ato 2

Site

Municipality of Fiano Romano

Timetable

Start: September 2024
End: October 2025

Detail of the service

  • Engineering services during the execution of works (Works Management).

     

  • Procurement of services and supplies, and the coordination of all the work necessary to provide the Customer with the finished work in a state-of-the-art manner.

Key numbers

Service execution quota

 

100% Acea Infrastructure SpA

 

 

Number of tanks

 

2

Amount of works

 

10.341.580 €

(of which €427,720 are for security costs)

 

 

Total capacity

 

2.000 m3

Residents in the district served by the project

 

7590 - with the expected demographic increase (time horizon 30-40 years), we will reach 15,280 inhabitants (project value).

Quotas

 

maximum water head 131.00 m above sea level and bottom at 127.00 m above sea level (maximum water head equal to 4 m)

 

 

Pipelines

 

approx. 3,9 Km

Discover all the projects

a basin at the source of the North Rome treatment plant with an orange iron bridge and trees in the background

Upgrading of biogas in biomethane at the Roma Nord Purification Plant

read more
Stack of worker helmets

Safety inspections on grids and service maintenance framework agreements

read more
South Rome treatment plant infrastructure containing water

New biofiltration section at the Roma Sud Purification Plant

read more
Laptop placed on an office desk. A smartphone and a cactus plant are also visible

The Co.Si. platform in support of the verification of professional technical suitability

read more
treatment plant infrastructure with a water basin

Adaptation of the La Chiusa purification plant

read more
Worker working on water infrastructure where a water basin is also visible

Construction of the Belvedere water tank

read more
plastic containers

Determination of microplastics in water for human consumption

read more
Two men and a woman in high-visibility clothing plan activities in a warehouse

Safety coordination during the execution stage in 2023-2024

read more
worker performing tests on an electrical cabinet with a large blue pipe in the background

Water supply of the Municipality of Campagnano di Roma

read more
water infrastructure with a basin full of water, iron structures and trees in the background

Revamping Depuratore Santa Marinella Nord

read more
hands weighing a substance on a scale in a laboratory setting

Enhancement of purification plant grids

read more
water collection basin in the Peschiera aqueduct infrastructure

Coordination of safety during the design phase in the New Peschiera Aqueduct

read more
worker operating machinery with a large orange pipe behind him

Doubling of the VIII siphon - Casa Valeria / exit Galleria Ripoli section

read more
scale model of an electrical system

Adjustment of the Valleranello Primary Cabin

read more
young girl conducting analysis in a laboratory

Micro-pollutants in the human body

read more
Aerial view of the Colle Sant'Angelo landscape, with trees and water reservoir

Monte Castellone - Colle Sant'Angelo duct

read more