Bioref-Full Project

A girl touches test tubes in a laboratory. A girl touches test tubes in a laboratory.

Description and objectives

 

As part of the ACEA-CNR Framework Agreement, the BIOREF research project was carried out in collaboration with IRSA-CNR. This project, based on the bioeconomy, aims to promote a new, more sustainable economic model. The experimental activity focuses on the integrated enhancement of sewage sludge and the organic fraction of municipal waste, exploiting the production potential of compounds with high added value, such as long-chain fatty acids.

Project details

 

IThe project was financed by Acea Infrastructure with an amount of €40,000 for the two-year period 2020-2021, intended for the fine-tuning of the process. The first phase of the project ended with the filing of a patent on the process developed, demonstrating the innovative potential of the research.

 

In the 2022-2024 three-year period, the project continued with a further funding of €75,000, with the aim of industrially scaling up the results obtained in the first phase. This next step aims to convert a mixture of urban organic waste, such as sewage sludge and the wet fraction of waste, into platform chemicals of industrial interest and bioenergy, aiming for a significant impact in terms of sustainability and innovation in the treatment and valorisation of urban waste.

Details of the service

 

Scientific partners and sites

Internal research activities

Sites

  • Laboratories of Acea Infrastructure SpA (Centre of Grottarossa Rome)

     

  • IRSA Laboratory (CNR – Montelibretti)

Project timeline

January 2021 - Ongoing

Service performed

 

Analytical activities

Key numbers of the service

Service execution quota

 

 

50%

Acea Infrastructure SpA

Project amount

 

180.000 €

 

 

Patent filed

 

1

 

 

A technical-economic assessment

A Life Cycle Assessment (LCA) of the entire technology chain

A scientific publication in an international journal

Discover all the projects

a basin at the source of the North Rome treatment plant with an orange iron bridge and trees in the background

Upgrading of biogas in biomethane at the Roma Nord Purification Plant

read more
Stack of worker helmets

Safety inspections on grids and service maintenance framework agreements

read more
South Rome treatment plant infrastructure containing water

New biofiltration section at the Roma Sud Purification Plant

read more
Laptop placed on an office desk. A smartphone and a cactus plant are also visible

The Co.Si. platform in support of the verification of professional technical suitability

read more
treatment plant infrastructure with a water basin

Adaptation of the La Chiusa purification plant

read more
Worker working on water infrastructure where a water basin is also visible

Construction of the Belvedere water tank

read more
plastic containers

Determination of microplastics in water for human consumption

read more
Two men and a woman in high-visibility clothing plan activities in a warehouse

Safety coordination during the execution stage in 2023-2024

read more
worker performing tests on an electrical cabinet with a large blue pipe in the background

Water supply of the Municipality of Campagnano di Roma

read more
water infrastructure with a basin full of water, iron structures and trees in the background

Revamping Depuratore Santa Marinella Nord

read more
hands weighing a substance on a scale in a laboratory setting

Enhancement of purification plant grids

read more
water collection basin in the Peschiera aqueduct infrastructure

Coordination of safety during the design phase in the New Peschiera Aqueduct

read more
worker operating machinery with a large orange pipe behind him

Doubling of the VIII siphon - Casa Valeria / exit Galleria Ripoli section

read more
scale model of an electrical system

Adjustment of the Valleranello Primary Cabin

read more
young girl conducting analysis in a laboratory

Micro-pollutants in the human body

read more
Aerial view of the Colle Sant'Angelo landscape, with trees and water reservoir

Monte Castellone - Colle Sant'Angelo duct

read more