PROMISCES Project

Zoom in on a hand holding a laboratory test tube near some machinery Zoom in on a hand holding a laboratory test tube near some machinery

Description and objectives

 

 

The PROMISCES project, funded under the Horizon 2020 call, aims to identify how industrial pollution can hinder the full development of the circular economy (CE) within the EU and to develop strategies to overcome these barriers, in line with the ambitions of the European Green Deal and the Circular Economy Action Plan.

Project details

 

PROMISCES considers specific pathways for some emerging contaminants, including:

 

    • Semi-closed water cycles for the supply of drinking water on an urban and basin scale;

       

    • Reuse of wastewater for irrigation in agriculture;

       

    • Recovery of nutrients from sewage sludge;

       

    • Recovery of materials from dredged sediments;

       

    • Regeneration of land for safe reuse in urban areas.

    Acea Infrastructure, in collaboration with SIMAM and the Polytechnic University of Marche, constitutes the Italian cluster in charge of developing advanced monitoring and abatement methodologies for some emerging contaminants, such as PFAS (polyfluorinated substances), in the different environmental matrices.

     

    In particular, Acea Infrastructure is involved in 3 Work Programs (WPs) with a total allocated budget of €425,000.

     

    The main activities consist in the development and application of new analytical methods (WP1) to specific case studies, in the treatment of port sediments (WP3) and in the treatment of landfill leachate (WP4).

     

    The project is in its third year of implementation. Acea Infrastructure has already presented the research results for WP1. In April 2024, as part of the dissemination of the main results, Acea Infrastructure hosted an event to disseminate innovative treatments for the reduction of PFAS from landfill leachates. The event, organised in collaboration with the Polytechnic University of Marche, saw the participation of national public bodies, control agencies and operators in the sector.

    Project Details

    Scientific partners

    European Community (Horizon 2020 Project) - 9 European countries

    Sites

    • Laboratories of Acea Infrastructure SpA (Centre of Grottarossa - Rome), for analytical activities

    • Ecoesedra (AN), for the treatment of port sediments


    • Leachate treatment plants in Genoa, Jesi, Treviso

    Project Timeline

    Start: October 2021

    End: April 2025

    Details of the service

    • Development of analysis methods on complex matrices

       

    • Analytical activities

    Key numbers

    Service execution quota

     

    3,5% Acea Infrastructure SpA

    Project value

     

    12,000,000 €

    ACEA Infrastructure financing

     

    425,000 €

    Partners involved

     

    27 partners

    European countries involved

     

    9 countries

    Discover all the projects

    a basin at the source of the North Rome treatment plant with an orange iron bridge and trees in the background

    Upgrading of biogas in biomethane at the Roma Nord Purification Plant

    read more
    Stack of worker helmets

    Safety inspections on grids and service maintenance framework agreements

    read more
    South Rome treatment plant infrastructure containing water

    New biofiltration section at the Roma Sud Purification Plant

    read more
    Laptop placed on an office desk. A smartphone and a cactus plant are also visible

    The Co.Si. platform in support of the verification of professional technical suitability

    read more
    treatment plant infrastructure with a water basin

    Adaptation of the La Chiusa purification plant

    read more
    Worker working on water infrastructure where a water basin is also visible

    Construction of the Belvedere water tank

    read more
    plastic containers

    Determination of microplastics in water for human consumption

    read more
    Two men and a woman in high-visibility clothing plan activities in a warehouse

    Safety coordination during the execution stage in 2023-2024

    read more
    worker performing tests on an electrical cabinet with a large blue pipe in the background

    Water supply of the Municipality of Campagnano di Roma

    read more
    water infrastructure with a basin full of water, iron structures and trees in the background

    Revamping Depuratore Santa Marinella Nord

    read more
    hands weighing a substance on a scale in a laboratory setting

    Enhancement of purification plant grids

    read more
    water collection basin in the Peschiera aqueduct infrastructure

    Coordination of safety during the design phase in the New Peschiera Aqueduct

    read more
    worker operating machinery with a large orange pipe behind him

    Doubling of the VIII siphon - Casa Valeria / exit Galleria Ripoli section

    read more
    scale model of an electrical system

    Adjustment of the Valleranello Primary Cabin

    read more
    young girl conducting analysis in a laboratory

    Micro-pollutants in the human body

    read more
    Aerial view of the Colle Sant'Angelo landscape, with trees and water reservoir

    Monte Castellone - Colle Sant'Angelo duct

    read more