New Peschiera Aqueduct

delle piccole cascate di acqua che riempiono una grande vasca all'interno della struttura dell'acquedotto del peschiera

Description and objectives

 

The project focuses on the construction of a new aqueduct infrastructure that supports and integrates the existing aqueduct, about 27,450 metres long, which ensures the water supply of the city of Rome and the Rieti territory, the Lower Sabina and the northern coast of Lazio, from Fiumicino to Civitavecchia.

 

The new structure aims to optimise the water management system, including a series of hydraulic tunnels and steel pipes. This new work will connect with the Salisano Hydroelectric Power Plant and the aqueducts to Rome.

 

The Peschiera-Capore System, built in the 1930s, has operated continuously for over 80 years and needs updating to ensure continuity of service in the water supply.

 

 

Project Objectives:

 

  • Reduce the risk of outages in the current system, which could have serious impacts on the water supply.

  • Guarantee the capacity to transport the full concession capacity of 10 m³/s to Rome, improving the safety and reliability of the system.

 

The total length of the new works is about 31 km, including branching works, new aqueduct, connection to the loading tank and surpass tunnel.

 

Planned Interventions

 

Branching works – springs – San Vittorino Plain

 

Construction of two parallel pipes (inner diameter of 2.50 m) using the microtunneling technique, up to the New Starting Artifact of the Aqueduct.

    Salisano intersection

     

    • Connection to the existing Load Tank to feed the hydroelectric power plant with the entire flow rate of 10 m³/s.

       

    • Construction of a system of tunnels and hydraulic load dissipation wells.

    New Upper Trunk of the Peschiera Aqueduct

     

     

    1. Excavation of a hydraulic tunnel with a TBM-EPB (internal diameter of 4.00 m) from Cotilia (Cittaducale) to San Giovanni Reatino.

     

     

     

     

     

    2. Crossing the valleys of Salto and Turano with siphons consisting of double pipes (inner diameter of 2.50 m), made with microtunneling

     

     

     

    3. From San Giovanni Reatino to Salisano, construction of a tunnel (inner diameter of 7.50 m) with a steel pipe (diameter of 3.40 m) using a ROCK TBM.

    Project details

     

    Customer  

    Acea Ato 2

    Site  

    Municipalities of Castel Sant'Angelo, Cittaducale, Rieti, Belmonte in Sabina, Montenero Sabino, Mompeo, Monte San Giovanni in Sabina e Salisano.

    Timetable  

    Start: September 2018
    End: October 2022

    Details of the service  

    • - DOCFAP (Feasibility document for design alternatives)

    • - PFTE (Technical-Economic Feasibility Project)

    • - Final project

    Key numbers

    Service execution quota

     

    100% Acea Infrastructure SpA

    Work Amount

     

    984.000.000 €

    Project scope

     

    10 m3/s

    Aqueduct length

     

    31 Km

    Discover all the projects

    una vasca della sorgente del depuratore di roma nord con un ponte arancione in ferro e gli alberi sullo sfondo

    Upgrading of biogas in biomethane at the Roma Nord Purification Plant

    read more
    zoom su una mano che tiene in mano una provetta di laboratorio vicino a dei macchinari

    PROMISCES Project

    read more
    Pila di caschi da operaio

    Safety inspections on grids and service maintenance framework agreements

    read more
    porzione della struttura in ferro dell'infrastruttura

    IV linea San Vittore

    read more
    Infrastruttura del depuratore di roma sud che contiene acqua

    New biofiltration section at the Roma Sud Purification Plant

    read more
    Una uomo in un laboratorio riempie delle provette

    Bioref-Full Project

    read more
    Laptop poggiato su una scrivania d'ufficio. Si vede anche uno smartphone e una pianta di cactus

    The Co.Si. platform in support of the verification of professional technical suitability

    read more
    infrastruttura di un depuratore con una vasca d'acqua

    Adaptation of the La Chiusa purification plant

    read more
    Operaio che lavora su una infrastruttura idrica in cui si vede anche una vasca d'acqua

    Construction of the Belvedere water tank

    read more
    contenitori di plastica

    Determination of microplastics in water for human consumption

    read more
    Due uomini e una donna in tenuta ad alta visibilità pianificano delle attività in un magazzino

    Safety coordination during the execution stage in 2023-2024

    read more
    operaio che fa delle prove su una cabina elettrica e ha sullo sfondo un grosso tubo azzurro

    Water supply of the Municipality of Campagnano di Romaa

    read more
    infrasturttura idrica con una vasca piena d'acqua, delle strutture in ferro e gli alberi sullo sfondo

    Revamping Depuratore Santa Marinella Nord

    read more
    mani che pesano una sostanza su una bilancia in un contesto di laboratorio

    Enhancement of purification plant grids

    read more
    vasca di raccolta dell'acqua nell'infrastruttura dell'acquedotto del peschiera

    Coordination of safety during the design phase in the New Peschiera Aqueduct

    read more
    operaio al lavoro su un macchinario. ha alle spalle un grande tubo arancione

    Doubling of the VIII siphon - Casa Valeria / exit Galleria Ripoli section

    read more
    riproduzione in scala di un impianto elettrico

    Adjustment of the Valleranello Primary Cabin

    read more
    giovane ragazza in fase di analisi in un laboratorio

    Micro-pollutants in the human body

    read more
    Vista dall'alto del paesaggio di Colle Sant'Angelo, con alberi e bacino idrico

    Monte Castellone - Colle Sant'Angelo duct

    read more