IV linea San Vittore

Iron structure, part of an industrial infrastructure Iron structure, part of an industrial infrastructure

Description and objectives

 

The purpose of this series of interventions is the plant adaptation and environmental arrangement of the San Vittore waste-to-energy plant through the construction of a fourth line.

The main objectives of the contract

 

  • Increase of waste and sludge treatment capacity.

  • Optimisation of the layout of some common sections of the system.

  • Improvement of the architectural insertion for the homogenisation of the entire site.

 

 

The new line is intended for the co-incineration of waste and sludge

    The plant is designed to operate up to 7,900 hours/year and is powered by RDF and dried/pelletised sewage sludge. with the following specifications:

    50 ,000

    tonnes/year of sewage sludge

    136 ,000

    tonnes/year of refuse-derived fuel (RDF)

    186 ,000

    tonnes/yearTotal capacity

    Details of the service

     

    Customer

    Acea Ambiente

    Site

    Municipality of San Vittore del Lazio

    Project timeline

    January 2021 - July 2022

    Service performed

    Final project
    CSP (Safety Coordinator in the Design phase)

    Key numbers of the service

    Service execution quota

     

    100% Acea Infrastructure SpA

     

    Amount of works

     

    €203,855,060.75 (of which €4,525,129.18 are for security costs)

     

    System capacity

     

    186,000 t/year (of which 50,000 t/year of sludge)

     

    Maximum continuous thermal load

     

    90 MWth

    Electrical power produced

     

    26.2 MWe

    Annual gross electricity production

     

    205,400 MWh

    Discover all the projects

    a basin at the source of the North Rome treatment plant with an orange iron bridge and trees in the background

    Upgrading of biogas in biomethane at the Roma Nord Purification Plant

    read more
    Stack of worker helmets

    Safety inspections on grids and service maintenance framework agreements

    read more
    South Rome treatment plant infrastructure containing water

    New biofiltration section at the Roma Sud Purification Plant

    read more
    Laptop placed on an office desk. A smartphone and a cactus plant are also visible

    The Co.Si. platform in support of the verification of professional technical suitability

    read more
    treatment plant infrastructure with a water basin

    Adaptation of the La Chiusa purification plant

    read more
    Worker working on water infrastructure where a water basin is also visible

    Construction of the Belvedere water tank

    read more
    plastic containers

    Determination of microplastics in water for human consumption

    read more
    Two men and a woman in high-visibility clothing plan activities in a warehouse

    Safety coordination during the execution stage in 2023-2024

    read more
    worker performing tests on an electrical cabinet with a large blue pipe in the background

    Water supply of the Municipality of Campagnano di Roma

    read more
    water infrastructure with a basin full of water, iron structures and trees in the background

    Revamping Depuratore Santa Marinella Nord

    read more
    hands weighing a substance on a scale in a laboratory setting

    Enhancement of purification plant grids

    read more
    water collection basin in the Peschiera aqueduct infrastructure

    Coordination of safety during the design phase in the New Peschiera Aqueduct

    read more
    worker operating machinery with a large orange pipe behind him

    Doubling of the VIII siphon - Casa Valeria / exit Galleria Ripoli section

    read more
    scale model of an electrical system

    Adjustment of the Valleranello Primary Cabin

    read more
    young girl conducting analysis in a laboratory

    Micro-pollutants in the human body

    read more
    Aerial view of the Colle Sant'Angelo landscape, with trees and water reservoir

    Monte Castellone - Colle Sant'Angelo duct

    read more