The purpose of this series of interventions is the plant adaptation and environmental arrangement of the San Vittore waste-to-energy plant through the construction of a fourth line.
The main objectives of the contract
Increase of waste and sludge treatment capacity.
Optimisation of the layout of some common sections of the system.
Improvement of the architectural insertion for the homogenisation of the entire site.
The new line is intended for the co-incineration of waste and sludge
The plant is designed to operate up to 7,900 hours/year and is powered by RDF and dried/pelletised sewage sludge. with the following specifications:
tonnes/year of sewage sludge
tonnes/year of refuse-derived fuel (RDF)
tonnes/yearTotal capacity
Service execution quota
100% Acea Infrastructure SpA
Amount of works
€203,855,060.75 (of which €4,525,129.18 are for security costs)
System capacity
186,000 t/year (of which 50,000 t/year of sludge)
Maximum continuous thermal load
90 MWth
Electrical power produced
26.2 MWe
Annual gross electricity production
205,400 MWh