Safety inspections on grids and service maintenance framework agreements

Stack of construction helmets Stack of construction helmets

Description and objectives

 

 

 

 

This service guarantees the execution of targeted or sample inspections and checks, within sites managed by Acea Group Companies, verifying compliance with current regulations not only in terms of safety, quality of the works to be carried out and decorum of the site, but also, where required, of minimum performance standards provided for in the tender documentation.

 

Construction sites in which the presence of the Safety Coordinator is required, according to the regulations, are excluded from the service.

Project details

 

In order to guarantee the optimal scheduling and planning of the resources engaged in the territory in safety and verification activities, the search for the sites to be inspected is carried out through a suite of software that allows an analysis of the safety risk inherent in the execution of the activities, which include:

    Automatic scheduling (safety rating algorithm) in the event of a high level of risk

    Manual scheduling in cases of medium and low risk level

    Urgent manual scheduling and on-call in cases of non-programmable activities (e.g. faults)

    Details

     

    Customer

    Areti and Acea Ato 2

    Site

    Province of Rome

    Project timeline

    January 2016 - Ongoing

    Service performed

    Safety inspection activities (for works and services that do not require Safety Coordination during Execution) 

    Key numbers of the service

    Service execution quota

     

    100% Acea Infrastructure SpA

    Annual inspections

     


    14,000

    20 FTE

     


    (16 Inspectors + 4 Planners)

    Annual turnover

     


    over € 4,000,000

    Discover all the projects

    a basin at the source of the North Rome treatment plant with an orange iron bridge and trees in the background

    Upgrading of biogas in biomethane at the Roma Nord Purification Plant

    read more
    Stack of worker helmets

    Safety inspections on grids and service maintenance framework agreements

    read more
    South Rome treatment plant infrastructure containing water

    New biofiltration section at the Roma Sud Purification Plant

    read more
    Laptop placed on an office desk. A smartphone and a cactus plant are also visible

    The Co.Si. platform in support of the verification of professional technical suitability

    read more
    treatment plant infrastructure with a water basin

    Adaptation of the La Chiusa purification plant

    read more
    Worker working on water infrastructure where a water basin is also visible

    Construction of the Belvedere water tank

    read more
    plastic containers

    Determination of microplastics in water for human consumption

    read more
    Two men and a woman in high-visibility clothing plan activities in a warehouse

    Safety coordination during the execution stage in 2023-2024

    read more
    worker performing tests on an electrical cabinet with a large blue pipe in the background

    Water supply of the Municipality of Campagnano di Roma

    read more
    water infrastructure with a basin full of water, iron structures and trees in the background

    Revamping Depuratore Santa Marinella Nord

    read more
    hands weighing a substance on a scale in a laboratory setting

    Enhancement of purification plant grids

    read more
    water collection basin in the Peschiera aqueduct infrastructure

    Coordination of safety during the design phase in the New Peschiera Aqueduct

    read more
    worker operating machinery with a large orange pipe behind him

    Doubling of the VIII siphon - Casa Valeria / exit Galleria Ripoli section

    read more
    scale model of an electrical system

    Adjustment of the Valleranello Primary Cabin

    read more
    young girl conducting analysis in a laboratory

    Micro-pollutants in the human body

    read more
    Aerial view of the Colle Sant'Angelo landscape, with trees and water reservoir

    Monte Castellone - Colle Sant'Angelo duct

    read more