New Torrerisi plant 

Acea plant with water collection tank and trees in the background Acea plant with water collection tank and trees in the background

Description and objectives

 

 

his project aims to improve environmental quality in the municipalities of Ausonia, Coreno Ausonio and Castelnuovo Parano, providing this area with an efficient system for the collection and purification of urban wastewater.

Project Objectives:

 

  • Convey the wastewater from the Municipality of Ausonia to the Torrerisi purification plant.

     

  • Convey wastewater from the municipalities of Coreno Ausonio and Castelnuovo Parano to the new purification system.

     

The project, therefore, includes all the civil works and the installation of the electro-mechanical works of the treatment plant, designed for a future capacity of 4,000 e.i. (equivalent inhabitants), divided into two treatment lines. In addition, it includes the construction of sewage collectors in Selvacava and "Production facilities" to convey wastewater to the new plant.

 

Planned Interventions

 

 

    Transformation of the Torrerisi Purification Plant

     

    - Transform the existing plant into a modern ‘nitro-denitro’ type active sludge plantwith tertiary refinement.

     

    - Size the plant for a future capacity of 4,000 equivalent inhabitants (e.i.), divided into two treatment lines.

      Ausonia sewage system

       

      - Create the Selvacava collector to connect this town to the existing sewerage system.

       

      - Build the "Production facilities" collector to convey the wastewater to the new purification plant.

       

      Castelnuovo Parano collector

       

      Create a collector to channel the wastewater from Castelnuovo Parano into the sewage network of Ausonia, directed to the new sewage treatment plant.

       

      Sewerage system of Coreno Ausonio

       

      - Build the Pimpinelli collector to collect sewage from the towns of Casali and Pimpinelli.

       

      - Create the SS630 collector to convey the Coreno Ausonio wastewater to the Ausonia sewage network, directed to the new purification plant.

      Project details

       

       

       

      Customer  

      Acea Ato 5

      Site  

      Municipalities of Ausonia, Coreno Ausonio e Castelnuovo Parano.

      Timetable  

      Start: February 2016
      End: December 2023

      Detail of the service  

      • Preliminary project

      • Final project

      • Executive project

      Key numbers

      Service execution quota

       

      100% Acea Infrastructure SpA

      Work Amount

       

      11.662.600 €

      including security charges

      Sewage purification plant potential

       

      4.000 equivalent inhabitants

      Discover all the projects

      a basin at the source of the North Rome treatment plant with an orange iron bridge and trees in the background

      Upgrading of biogas in biomethane at the Roma Nord Purification Plant

      read more
      Stack of worker helmets

      Safety inspections on grids and service maintenance framework agreements

      read more
      South Rome treatment plant infrastructure containing water

      New biofiltration section at the Roma Sud Purification Plant

      read more
      Laptop placed on an office desk. A smartphone and a cactus plant are also visible

      The Co.Si. platform in support of the verification of professional technical suitability

      read more
      treatment plant infrastructure with a water basin

      Adaptation of the La Chiusa purification plant

      read more
      Worker working on water infrastructure where a water basin is also visible

      Construction of the Belvedere water tank

      read more
      plastic containers

      Determination of microplastics in water for human consumption

      read more
      Two men and a woman in high-visibility clothing plan activities in a warehouse

      Safety coordination during the execution stage in 2023-2024

      read more
      worker performing tests on an electrical cabinet with a large blue pipe in the background

      Water supply of the Municipality of Campagnano di Roma

      read more
      water infrastructure with a basin full of water, iron structures and trees in the background

      Revamping Depuratore Santa Marinella Nord

      read more
      hands weighing a substance on a scale in a laboratory setting

      Enhancement of purification plant grids

      read more
      water collection basin in the Peschiera aqueduct infrastructure

      Coordination of safety during the design phase in the New Peschiera Aqueduct

      read more
      worker operating machinery with a large orange pipe behind him

      Doubling of the VIII siphon - Casa Valeria / exit Galleria Ripoli section

      read more
      scale model of an electrical system

      Adjustment of the Valleranello Primary Cabin

      read more
      young girl conducting analysis in a laboratory

      Micro-pollutants in the human body

      read more
      Aerial view of the Colle Sant'Angelo landscape, with trees and water reservoir

      Monte Castellone - Colle Sant'Angelo duct

      read more