New Torrerisi plant 

Impianto Acea con vasca di raccolta dell'acqua e alberi sullo sfondo

Description and objectives

 

 

his project aims to improve environmental quality in the municipalities of Ausonia, Coreno Ausonio and Castelnuovo Parano, providing this area with an efficient system for the collection and purification of urban wastewater.

Project Objectives:

 

  • Convey the wastewater from the Municipality of Ausonia to the Torrerisi purification plant.

     

  • Convey wastewater from the municipalities of Coreno Ausonio and Castelnuovo Parano to the new purification system.

     

The project, therefore, includes all the civil works and the installation of the electro-mechanical works of the treatment plant, designed for a future capacity of 4,000 e.i. (equivalent inhabitants), divided into two treatment lines. In addition, it includes the construction of sewage collectors in Selvacava and "Production facilities" to convey wastewater to the new plant.

 

Planned Interventions

 

 

    Transformation of the Torrerisi Purification Plant

     

    - Transform the existing plant into a modern ‘nitro-denitro’ type active sludge plantwith tertiary refinement.

     

    - Size the plant for a future capacity of 4,000 equivalent inhabitants (e.i.), divided into two treatment lines.

      Ausonia sewage system

       

      - Create the Selvacava collector to connect this town to the existing sewerage system.

       

      - Build the "Production facilities" collector to convey the wastewater to the new purification plant.

       

      Castelnuovo Parano collector

       

      Create a collector to channel the wastewater from Castelnuovo Parano into the sewage network of Ausonia, directed to the new sewage treatment plant.

       

      Sewerage system of Coreno Ausonio

       

      - Build the Pimpinelli collector to collect sewage from the towns of Casali and Pimpinelli.

       

      - Create the SS630 collector to convey the Coreno Ausonio wastewater to the Ausonia sewage network, directed to the new purification plant.

      Project details

       

       

       

      Customer  

      Acea Ato 5

      Site  

      Municipalities of Ausonia, Coreno Ausonio e Castelnuovo Parano.

      Timetable  

      Start: February 2016
      End: December 2023

      Detail of the service  

      • Preliminary project

      • Final project

      • Executive project

      Key numbers

      Service execution quota

       

      100% Acea Infrastructure SpA

      Work Amount

       

      11.662.600 €

      including security charges

      Sewage purification plant potential

       

      4.000 equivalent inhabitants

      Discover all the projects

      una vasca della sorgente del depuratore di roma nord con un ponte arancione in ferro e gli alberi sullo sfondo

      Upgrading of biogas in biomethane at the Roma Nord Purification Plant

      read more
      zoom su una mano che tiene in mano una provetta di laboratorio vicino a dei macchinari

      PROMISCES Project

      read more
      Pila di caschi da operaio

      Safety inspections on grids and service maintenance framework agreements

      read more
      porzione della struttura in ferro dell'infrastruttura

      IV linea San Vittore

      read more
      Infrastruttura del depuratore di roma sud che contiene acqua

      New biofiltration section at the Roma Sud Purification Plant

      read more
      Una uomo in un laboratorio riempie delle provette

      Bioref-Full Project

      read more
      Laptop poggiato su una scrivania d'ufficio. Si vede anche uno smartphone e una pianta di cactus

      The Co.Si. platform in support of the verification of professional technical suitability

      read more
      infrastruttura di un depuratore con una vasca d'acqua

      Adaptation of the La Chiusa purification plant

      read more
      Operaio che lavora su una infrastruttura idrica in cui si vede anche una vasca d'acqua

      Construction of the Belvedere water tank

      read more
      contenitori di plastica

      Determination of microplastics in water for human consumption

      read more
      Due uomini e una donna in tenuta ad alta visibilità pianificano delle attività in un magazzino

      Safety coordination during the execution stage in 2023-2024

      read more
      operaio che fa delle prove su una cabina elettrica e ha sullo sfondo un grosso tubo azzurro

      Water supply of the Municipality of Campagnano di Romaa

      read more
      infrasturttura idrica con una vasca piena d'acqua, delle strutture in ferro e gli alberi sullo sfondo

      Revamping Depuratore Santa Marinella Nord

      read more
      mani che pesano una sostanza su una bilancia in un contesto di laboratorio

      Enhancement of purification plant grids

      read more
      vasca di raccolta dell'acqua nell'infrastruttura dell'acquedotto del peschiera

      Coordination of safety during the design phase in the New Peschiera Aqueduct

      read more
      operaio al lavoro su un macchinario. ha alle spalle un grande tubo arancione

      Doubling of the VIII siphon - Casa Valeria / exit Galleria Ripoli section

      read more
      riproduzione in scala di un impianto elettrico

      Adjustment of the Valleranello Primary Cabin

      read more
      giovane ragazza in fase di analisi in un laboratorio

      Micro-pollutants in the human body

      read more
      Vista dall'alto del paesaggio di Colle Sant'Angelo, con alberi e bacino idrico

      Monte Castellone - Colle Sant'Angelo duct

      read more