Enhancement of purification plant grids

Hands weighing a substance on a scale in a laboratory setting Hands weighing a substance on a scale in a laboratory setting

Description and objectives

 

 

As part of the 2023 research commissioning plan for Acea Ato 2, a collaborative study was launched with the Department of Chemistry of the University La Sapienza, aimed at identifying virtuous paths for the enhancement of residues from the sieve analysis process of incoming flows to purification plants.

The main objective of the study was to carefully evaluate the composition and characteristics of the sieved material produced throughout the year.

 

The aim was to examine both the energy content recoverable by thermo-combustion, thermo-chemical processes or alternatively by anaerobic digestion in co-digestion with waste sludge, with the possibility of recovering material to be used (COD) from the squeeze liquid.

Project details

 

As part of the study, adequate technologies have been identified to:

      Squeezing treatment - identification of technologies for the efficient squeezing of residues

      Energy recovery - evaluation of technologies for energy recovery from solid waste

      Technical-economic and environmental analysis - detailed analysis of the costs, benefits and environmental impacts of the solutions proposed for the valorisation process

      Details

       

       

      Customer

      Acea Ato 2

      Scientific partner

      University “La Sapienza” - Rome

      Sites

      • Laboratories of Acea Infrastructure SpA (Centre of Grottarossa - Rome)

         

      • Laboratory of the Department of Chemistry of La Sapienza (Rome)

         

      • Acea Ato 2 purification plants (Central Lazio)

      Project timeline

      January 2023 - March 2024

      Service performed

      • Context and regulatory analysis

         

      • Technical-economic-environmental feasibility study

         

      • Analytical activity

      Key numbers

      • Service execution quota: 50% Acea Infrastructure SpA  

      • Project amount: €50,000

      Discover all the projects

      a basin at the source of the North Rome treatment plant with an orange iron bridge and trees in the background

      Upgrading of biogas in biomethane at the Roma Nord Purification Plant

      read more
      Stack of worker helmets

      Safety inspections on grids and service maintenance framework agreements

      read more
      South Rome treatment plant infrastructure containing water

      New biofiltration section at the Roma Sud Purification Plant

      read more
      Laptop placed on an office desk. A smartphone and a cactus plant are also visible

      The Co.Si. platform in support of the verification of professional technical suitability

      read more
      treatment plant infrastructure with a water basin

      Adaptation of the La Chiusa purification plant

      read more
      Worker working on water infrastructure where a water basin is also visible

      Construction of the Belvedere water tank

      read more
      plastic containers

      Determination of microplastics in water for human consumption

      read more
      Two men and a woman in high-visibility clothing plan activities in a warehouse

      Safety coordination during the execution stage in 2023-2024

      read more
      worker performing tests on an electrical cabinet with a large blue pipe in the background

      Water supply of the Municipality of Campagnano di Roma

      read more
      water infrastructure with a basin full of water, iron structures and trees in the background

      Revamping Depuratore Santa Marinella Nord

      read more
      hands weighing a substance on a scale in a laboratory setting

      Enhancement of purification plant grids

      read more
      water collection basin in the Peschiera aqueduct infrastructure

      Coordination of safety during the design phase in the New Peschiera Aqueduct

      read more
      worker operating machinery with a large orange pipe behind him

      Doubling of the VIII siphon - Casa Valeria / exit Galleria Ripoli section

      read more
      scale model of an electrical system

      Adjustment of the Valleranello Primary Cabin

      read more
      young girl conducting analysis in a laboratory

      Micro-pollutants in the human body

      read more
      Aerial view of the Colle Sant'Angelo landscape, with trees and water reservoir

      Monte Castellone - Colle Sant'Angelo duct

      read more